Medium and vessel
Liquid, slurry, powder or granule; tank height, silo height, nozzle size, side/top mounting, agitator, foam, vapor, dust or buildup.
Send medium, measuring range, tank or silo dimensions, process connection, output signal and quantity. WELK Level reviews the level measurement conditions before quoting a radar, ultrasonic, hydrostatic, magnetic, guided wave radar or level switch solution.
Uploaded reference files are included with the inquiry. For larger CAD packages, reply to the confirmation email or send them here:
Our team typically replies within 24 hours.
Liquid, slurry, powder or granule; tank height, silo height, nozzle size, side/top mounting, agitator, foam, vapor, dust or buildup.
Measuring range, pressure, temperature, density or dielectric constant if known, corrosion risk, cleaning requirement and hazardous-area requirement.
4-20 mA, HART, RS-485 Modbus, relay, PNP/NPN/NAMUR, local display, controller, alarm logic, power supply and PLC or telemetry interface.
Thread, flange, bracket, cable, probe, antenna, diaphragm, chamber or float material, plus any lining or anti-corrosion requirement.
Tank drawings, silo sketches, old datasheets, nameplates, wiring photos and installation photos help prevent wrong technology selection.
Quantity, target delivery time, OEM label, packing requirement, calibration record, certificate of conformity and inspection-photo needs.
Send medium, range, tank or silo dimensions, pressure, temperature, process connection, output signal, power supply, quantity and installation photos if available.
Yes. If the requested product looks unsuitable for foam, vapor, dust, pressure, corrosion or solids, WELK will explain the concern and suggest a safer technology.
Yes. Small files can be uploaded in the inquiry form. For large or confidential files, submit the form first and then email the files with your company or project reference.
Yes. OEM label, model code, documentation and packing can be reviewed for repeat orders or distributor projects after the technical specification is confirmed.
Typical response time is within the published business-hour window. Complex applications may need an additional engineering review before a final model and price are confirmed.